Đề Thi PE PMG201c - SP26 - PE - NO1 - RE

adminadmin is verified member.

Member
Thành viên BQT
Administrator
Học kỳ
SP2026
Thời Gian
4/5/26
Loại tài liệu
PE
Mã Đề
PMG201c_SP26_PE2_572883
PMG201c SP26 PE NO1 RE
PMG201c - Practical Exam 2 (Spring 2026)
Coi Cafe is a pure Vietnamese coffee brand with 12 stores in Hanoi and Ho Chi Minh City, famous for its nostalgic space, traditional drink menu, and sustainable business model (using reusable cups, purchasing coffee directly from Dak Lak farmers). Coi's management decided to implement an expansion project into 5 Central provinces (Da Nang, Hue, Quang Nam, Quang Ngai, Binh Dinh), with I flagship store in each province within 12 months. The project includes: surveying and selecting premises, designing and constructing interiors consistent with the brand, recruiting and training local personnel, building a raw material supply chain from Central region suppliers, and launching campaigns for each store. The project is led by the Market Development Director as PM, coordinating with the interior design team, HR team, and marketing team. The total budget is VND 8.5 billion (approximately VND 1.7 billion/store) from equity and commercial bank loans. Each store must reach the break-even point within 8 months after opening.
Request 1 (20%): develop a narrative charter statement that includes the following details
1. Project name,
2. Justifications (purpose & reasons to implement this project),
3. Project constraints, in terms of scope, time, cost/budget, and quality.
Request 2 (20%): provide at least five main cost/budget items. Each cost/budget item, you need to provide following details: name, description, estimation along with the way to estimate (how to estimate, person in charged,..)
Request 3 (30%): identify three project risks by listing out the risk title/name, description, possible impacts (in term of scope or quality, time, and cost), and relevant risk response plans (mitigation, contingency).
Request 4 (30%): describe the RACI chart where you:
1. Define at least three project roles
2. List out at least ten tasks, activities, or deliverables.
3. For each task/activity/deliverable, list out the responsibilities of the project roles.
 

Đính kèm

  • PMG201c SP26 PE NO1 RE.webp
    PMG201c SP26 PE NO1 RE.webp
    723.5 KB · Lượt xem: 20

Tạo tài khoản hoặc đăng nhập để bình luận

Bạn phải là thành viên mới có thể bình luận.

Tạo tài khoản

Hãy tạo tài khoản trên cộng đồng của chúng tôi. Thật dễ dàng!

Đăng nhập

Bạn đã có tài khoản? Đăng nhập tại đây.

Back
Top